Australia: Urgent recall issued for defective Mazda vehicles - - PressFrom - Australia
  •   
  •   

Australia Urgent recall issued for defective Mazda vehicles

22:36  11 october  2019
22:36  11 october  2019 Source:   9news.com.au

Driver bailed over double fatal crash

  Driver bailed over double fatal crash The 19-year-old accused of killing two people in a fiery crash in Melbourne faced court overnight.Hayden Currie, 19, was granted bail after appearing in the Melbourne Magistrates Court charged with an array of offences over the crash which killed two young people on Sunday night in Oakleigh East.

a close up of a car: Mazda is urgently recalling more than 35,000 vehicles believed to be defective. © AAP Mazda is urgently recalling more than 35,000 vehicles believed to be defective. Mazda is urgently recalling more than 35,000 vehicles believed to be defective.

The massive recall applies to diesel-powered Mazda 3s built between 2014 and 2016, Mazda 6s built between 2012 and 2018, Mazda CX-5s built between 2012 and 2018.

These vehicles may accumulate carbon deposits in the intake shutter valve and suffer premature wear of certain engine components, Mazda said.

Drivers may experience a gradual drop in engine power, multiple warning lights on the dashboard, an increase in vehicle stopping distance, potential engine stall with no re-start and smoke emitting from the engine, the company said.

Anyone driving one of the affected vehicles were at an increased risk of accident or injury.

Mazda said it would inspect all recalled models and if required fix any defective vehicles. It will also complete a software update to the Engine Control Module at no charge.

Anyone who believes their vehicle may be affected should contact Mazda straight away on 1800 034 411.

Mascot Towers owners vote on repair bill .
Owners of Sydney's problem-plagued Mascot Towers will vote to approve a $1 million bill for urgent repair works. Owners of the problem-plagued Mascot Towers are to be asked to approve a $1 million repairs bill for urgent work to restore the building's cracked foundations.The 132-apartment tower was evacuated in mid-June after cracking was found in the primary support structure and facade masonry. require(["inlineoutstreamAd", "c.

—   Share news in the SOC. Networks

Topical videos:

usr: 2
This is interesting!