•   
  •   

US News The first Arab nuclear power plant in operation at Abu Dhabi

12:30  07 april  2021
12:30  07 april  2021 Source:   lefigaro.fr

In Japan, the contaminated water of the Fukushima nuclear power plant will be rejected in the ocean

 In Japan, the contaminated water of the Fukushima nuclear power plant will be rejected in the ocean © Kazuhiro Nogi, AFP The Japanese nuclear power plant from Fukushima-Daiichi, operated by TEPCO, March 10. Japan has made its choice and promises sea controls. But many fishermen and riparian countries no longer confidence in the Japanese nuclear authorities, since the March 2011 disaster. after months of debates and studies, the government Japanese has decided on Tuesday, April 13th.

Barakah a été construite par un consortium mené par Emirates Nuclear Energy Corporation (ENEC) et par le sud-coréen Korea Electric Power Corporation (KEPCO), pour un coût estimé à 24,4 milliards de dollars (environ 20,4 milliards d’euros) © - / AFP Barakah was built by a consortium led by Emirates Nuclear Energy Corporation (Enec) and South Korea Korea Electric Power Corporation (KEPCO), for An estimated cost of $ 24.4 billion (approximately 20.4 billion euros)

a first among Arab countries. The United Arab Emirates announced, Tuesday, the first electron sales of their Barakah nuclear power plant, after a reactor was started in August last . "The first megawatt of the first Arab nuclear power plant has entered the national electricity grid" , said Sheikh Mohammed, also governor of the Emirate of Dubai, one of the seven of the United Arab Emirates Federation.

"Chernobyl, Death Zero": When Montebourg underestimates the consequences of the nuclear disaster

 © Copyright 2021, Obs "Chernobyl, dead zero". This erroneous information, given by former Minister Arnaud Montebourg during a debate organized by the Media Reporter with the ecologist mayor of Grenoble Eric Piolle , about nuclear power in France, was retained by activists on Twitter .

»Read also - The United Arab Emirates probe stands in orbit around March, an Arabic

first when they are fully operational, the four Barakah reactors will represent a total power of 5600 megawatts, about a quarter of the needs. Electricity of this very hot country and very energy, especially summer with air conditioning operating at full speed.

Barakah was built by a consortium led by Emirates Nuclear Energy Corporation (ENEC) and South Korea Korea Electric Power Corporation (KEPCO), at an estimated cost of $ 24.4 billion (approximately 20.4 billion euros). French side, EDF will intervene in the training of the staff of the nuclear safety plant, while the ANDRA (National Agency for the Management of Radioactive Waste) has signed a partnership for the development of the radioactive waste reprocessing sector.

Apart from nuclear, the country has also set up a multi-billion dollar program to develop renewable energies, with the aim of producing 50% of its energy from clean sources by 2050. Its great neighbor, Saudi Arabia, the first oil exporter, said his intention to build 16 nuclear

reactors, a project that, for the moment, did not materialize.

Lead 2-Tehran and Washington evoke constructive discussions on Iranian nucleari .
Iran-nuclear / (Lead 2, TV, Photo): Lead 2-Tehran and Washington evoke constructive discussions on Iranian nuclear power (updated in paragraphs 4 -5 with the statements of the US State Department) by Francois Murphy, Parisa Hafezi and John Irish Vienna, April 6 (Reuters) - Tehran and the great powers will continue discussions on a revival of the Vienna Agreement on The Iranian nuclear program, Tuesday told state television the main Iranian negotiator on the file.

usr: 1
This is interesting!