•   
  •   
  •   

World Moselle: The reactor 3 of the Cattenom nuclear power plant again set to the force of force

20:45  06 october  2021
20:45  06 october  2021 Source:   20minutes.fr

North Korea claims successful hypersonic missile test

  North Korea claims successful hypersonic missile test The advanced technology makes missiles much harder to defend against, but South Korea says the North still needs "a considerable time" to perfect the weapons. Hypersonic missiles move much faster and are more agile than standard ones, making them much harder for missile defense systems — on which the U.S. is spending billions — to intercept. However, South Korean officials said the North still appeared to be a "considerable time" from finalizing the new weapon, and that defense systems shared with the U.S. were capable of stopping it.

The reactor of the Lorraine power station automatically settled after detecting a fault

  Moselle : Le réacteur 3 de la centrale nucléaire de Cattenom de nouveau mis à l’arrêt de force © SPIEGL / PhotoWeb / SIPA dysfunction - The reactor of the Lorraine power station automatically settled after detecting a failure

the production unit number 3 of the nuclear power station ( Moselle ) was the victim of a new incident. The latter took place in the night from Monday to Tuesday around 4:30, reports The Republican Lorrain . The reactor automatically settled after detecting an failure. The malfunction is currently the subject of a diagnostic phase.

Two incidents in three weeks

This new event took place soon after a first incident, occurred on September 16th . Ten days after restarting the reactor. This time, it's a faulty filter that was involved. "The teams of the Cattenom plant have stopped the production unit number 3 in order to carry out a maintenance intervention on a filter on one of the food turbope pumps, located in the room of the machines (no. Nuclear installation) ", then indicated EDF in a statement.

Congress's role in the AUKUS nuclear-powered submarine deal

  Congress's role in the AUKUS nuclear-powered submarine deal Congress can — and should — be skeptical of any “exception” that could weaken nonproliferation policy.U.S.

These two incidents occurred in the wake of the reactor number 3. The latter had "been arrested for its third ten-year visit of February 12 to September 3, 2021", notes the Nuclear Safety Authority (ASN) on his website .

Miscellaneous facts: a worker mortally falls from the scaffolding around a bell tower various factsMoselle: a 21-year-old motorist dies in an accident with camber

The AUKUS deal says more about US plans to take on China than Biden will admit .
The AUKUS pact raises serious questions about the future relationship between the United States and most of its European allies. While Australia, Britain, and the United States were negotiating this agreement, they decided to keep Paris in the dark since it involved cancelling France's previous submarine deal with Canberra.French President Emmanuel Macron was so infuriated with what he viewed as deception that he recalled France's ambassadors to both Australia and the United States, escalating the diplomatic rift created by the deal.

usr: 1
This is interesting!